The Promise and the Package
Value Stream Mapping (VSM) has long been a staple of lean manufacturing curricula. In Chapter 181 of the business-wissen.de handbook, Dr. Jürgen Fleig presents VSM as both a prerequisite for Six Sigma Green Belt certification and a collaborative workshop tool. The chapter distinguishes itself by prescribing a low-fidelity starting point: teams should sketch the current state on paper using a defined symbol set before any digitization. This pen-and-paper-first approach aims to build shared understanding across functions before software introduces its own constraints.
Fleig frames the method around a deceptively simple premise: separate value-adding steps from non-value-adding ones from the customer’s perspective, where “customer” includes both external buyers and internal downstream departments. Only processing time counts as value-adding; wait times, transport, and rework are waste made visible through a timeline notation. Seven waste categories are targeted – delays, waiting, high material or energy cost, scrap, handling errors, and missing parts – each marked on the map with a “Kaizen Blitz” symbol to flag improvement opportunities.
Two Nested Procedures
The chapter prescribes two interlocking sequences. A five-step current-state sequence begins with bounding product and process scope, assembling a three-to-six-person cross-functional team with Kaizen or Six Sigma experience and management backing, walking the process (Gemba) and mapping steps using SIPOC, collecting quantitative data – cycle times, wait times, setup times, inventory, lot sizes, headcount, available hours, equipment, energy, defect and rework rates – via observation, measurement, or ERP/MRP extraction, and visualizing everything using a standardized symbol set.
A complementary seven-step methodology extends this foundation. Steps one through five build the current-state map with data boxes per step capturing inventory volume, cycle time, changeover time, uptime, headcount, shifts, available hours, and lot size. Step six applies a sixteen-point evaluation checklist across four dimensions: process activities (value-adding, adequate, flexible, available), material flow (flowing, even, low inventory), information flow (demand-driven pull, autonomous control, push-based supply), and timeline metrics (lead time versus customer expectation, processing versus waiting versus changeover versus downtime versus rework time). Step seven mandates a future-state design (Soll-Zustand), an action plan, and a management decision template comparing current versus future state. The author advises returning to the shop floor if uncertainties remain during analysis.
Symbols, Data Boxes, and the Pull Ideal
The symbol taxonomy is extensive. Supplier and customer icons, process boxes with worker icons, data boxes for metrics, Kanban supermarkets with reorder-card triggers, and distinct arrows for material flow (push versus pull) and information flow create a granular visual language. Information flow arrows differentiate manual (straight), electronic or EDI or LAN or WAN (zigzag), Kanban card with order quantity and lead time, signal Kanban for visual replenishment triggers, load leveling, and IT systems. This granularity supports detailed current-state capture but assumes a Kanban pull ideal that may not map to environments requiring Heijunka and advanced planning.
Data collection requires explicit agreement on “processing time” definitions – execution, setup, transport, breaks, maintenance – to avoid misinterpretation. The chapter cites REFA time studies as a potential source for processing times but does not specify which REFA standards, sampling rules, or observer-training requirements are assumed, leaving data-quality risk unquantified.
A Template Ecosystem With Strings Attached
Immediate application depends on access to a proprietary template suite hosted on the business-wissen.de platform. A pre-mapping questionnaire (Art.-Nr. 99.012.09) handles scoping. PowerPoint templates (Art.-Nr. 99.181.03 through 07, among others) cover data collection forms, multi-step aggregation, single-step multi-measurement, target-actual comparison, process strength-weakness check, process description, resource planning, Ishikawa diagrams, and process quality tasks. Three companion Excel templates address Process Quality Definition (99.129.42), Process Evaluation (99.129.46), and Time Planning (99.012.26). Software suggestions include PowerPoint for basic use, Visio with add-ins for flexibility, and Lucidchart or EDraw for specialized mapping. Template disclaimers note minor display errors in pre-2016 Office versions, relevant for organizations on legacy systems.
Examples as Symbol References, Not Outcome Evidence
Section 4 concludes with seven illustrative diagram examples sourced externally – a generic Lucidchart web illustration, a PDF from UW-S Synchro Experts dated 29 September 2010, material from Benjamin Aunkofer, slides from Hans-Werner Fuchs (Hochschule Mittweida, 2009), figures from Frank Bertagnolli (Springer, 2018), and diagrams from Klaus Erlach (Springer, 2010). These serve as symbol-usage references. No independent empirical case data, benchmarking ranges, or quantitative results are provided in any section. The examples represent a curated survey of existing VSM literature rather than original case studies demonstrating VSM outcomes.
Contextual Boundaries and Hidden Assumptions
The methodology assumes discrete manufacturing contexts – references to machines, changeover times, lot sizes, and intermediate products permeate the text. Its assertion of applicability to software, healthcare, and services lacks illustrative symbols, adapted data-box definitions, or worked examples. The discrete-manufacturing symbol set does not visibly translate.
The “ideal” information flow is defined as Kanban pull-based with minimal central scheduling. The checklist scores demand-driven pull and autonomous control positively and push-based supply negatively. This normative stance needs contextual qualification for MRP-dominated, high-variability, or regulated environments. High-mix low-volume or engineered-to-order settings may find the pull ideal conflicts with their production control logic.
Execution feasibility assumes management sponsorship and team expertise (Kaizen Six Sigma experience), potentially excluding resource-constrained settings. The three-to-six-person cross-functional team requirement may be impractical for small organizations. Data accuracy relies on reliable IT systems or time studies, which are not detailed in the chapter.
Evidence Base and Author Affiliation
No independent empirical case data, benchmarking ranges, or quantitative results support the chapter’s claims. The sixteen-point evaluation checklist’s four-dimension sixteen-item structure is prescribed but not referenced to a source such as Rother and Shook, Toyota, or a specific lean institute; its predictive power for improvement outcomes is untested in the chapter. The claim that VSM “increases customer satisfaction and competitiveness” is stated without citation, benchmark, or mechanism.
Fleig’s consulting affiliation in concept development, process design, and project management may bias emphasis toward workshop facilitation over statistical rigor. The Green Belt prerequisite framing aligns with a training certification pipeline rather than an open methodology. Cross-references to SIPOC (Chapter 175), Process Management (Chapter 12), Six Sigma (Chapter 98), and Brown-Paper Method (Chapter 193) situate VSM within a broader methodological suite hosted on the same platform, but actual interoperability of templates and terminology across those chapters is not demonstrated.
Practical Takeaways for Practitioners
A practitioner following this chapter would secure management sponsorship, assemble the cross-functional team, use the pre-mapping questionnaire to bound scope, conduct a Gemba walk with SIPOC, sketch the current state on paper using the prescribed symbol set, populate data boxes for each step with the required metrics, digitize the map using the PowerPoint templates or suggested software, apply the sixteen-point evaluation checklist, mark Kaizen Blitz opportunities, design a future state using the Soll-Zustand template, produce an action plan, and complete the management decision template. If uncertainties persist, return to the shop floor for clarification.
The template dependencies mean immediate application requires access to the business-wissen.de repository via purchase or subscription. The procedure assumes reliable IT systems or capacity for time studies; resource-constrained settings may struggle with the data-collection burden. The Kanban pull ideal information flow model should be stress-tested against the actual production control logic before adopting the future-state design. The chapter functions as a detailed workshop script with proprietary template dependencies, not as a standalone evidence-based implementation guide.