The Authorization Triad: Why Cost Planning Cannot Wait
Most project managers treat the budget as a compliance exercise – something to satisfy finance after the scope and schedule are settled. Dr. Jürgen Fleig’s framework, documented across three chapters of a German project management handbook and distributed through b-wise GmbH, takes a harder line. A project plan is invalid without three co-equal pillars: a defined result, a viable schedule, and a credible cost plan. The cost plan is not a bureaucratic artifact; it is a mandatory prerequisite for authorization.
This triad forces a discipline that many organizations avoid. The cost plan must serve four distinct masters simultaneously: it must prove economic viability for a go/no-go decision, quantify budget and resource requirements, establish a defensible offer price for external clients, and set the baseline (Soll) for variance control. If the plan cannot do all four, the project has not been planned – it has only been hoped for.
Two Planning Topologies, One Data Model
The methodology refuses to prescribe a single planning direction. Bottom-up planning aggregates from discrete work packages upward; top-down allocates a fixed budget downward across the work breakdown structure (PSP). The choice is contextual. In a fixed-price machinery bid, the estimator builds from the ground up – every hour, every prototype part, every travel kilometer. In an internal IT rollout with a €2 million cap, the CIO distributes the ceiling across phases and partners.
What makes this work is a shared data model. Whether the numbers flow up or down, they land in the same resource matrix: a many-to-many mapping of PSP elements (phase, work package, sub-work package, milestones) to partners (internal departments, suppliers, consultants, research institutes, even the customer), to resource categories (personnel, equipment, space, software, catering, travel, insurance, web hosting), to cost types, to time periods, to certainty levels. This matrix is the calculation engine. Every euro traces to a structural element, a responsible party, a resource, a period, and a confidence flag.
Rates That Breathe: The Four-Period Horizon
Unit rates are not static. The framework supports up to four distinct rate periods per resource, allowing known step-changes – collective bargaining increases, annual salary reviews, indexed supplier contracts – to be modeled explicitly. Rates are sourced from three channels: accounting records, supplier quotes, or internal cost accounting (Kostenrechnung). The distinction matters. Kostenrechnung implies fully burdened rates – overhead, social costs, imputed interest – rather than mere salary or list prices.
The four-period cap is a deliberate constraint. A five-year infrastructure project with annual escalation clauses exceeds this capacity without workarounds such as averaging later years or splitting resources artificially. The framework’s heuristic – “as detailed as necessary, as coarse as possible” – applies here: model the known inflection points, aggregate the rest.
Risk as a Line Item, Not a Distribution
Uncertainty enters the model through a deterministic risk surcharge applied at the line-item level: a flat monetary value multiplied by a probability/buffer factor. A dedicated “Risk” cost class isolates these buffers for pivot filtering. This is arithmetic, not probabilistic. There are no Monte Carlo simulations, no PERT distributions, no correlation modeling between cost lines (steel price and freight cost rising together), and no schedule-driven cost escalation (delay → extended overhead). The scenario tool, sold separately, applies percentage surcharges or deductions to the baseline plan to model scope creep or schedule shifts – but it operates on totals, not by re-driving the resource-quantity logic.
For many commercial contexts, this simplification is a feature. A sales team can instantly show a client: “Your request for 24/7 support adds cost X (vendor night-shift rate × days × surcharge).” The margin is traceable to a resource assumption. But in regulated industries or long-duration programs, the lack of probabilistic output and correlation modeling becomes a compliance gap.
Pivot Reporting: One Model, Many Views
The tool’s output layer uses Excel Pivot Tables and Slicers (Datenschnitte) to enable combinatorial slicing: costs by phase × partner × cost type × year. This solves the “many masters” problem. Finance needs period accruals for IFRS/HGB compliance. The project manager needs work-package actuals for Earned Value integration. Procurement needs partner-specific breakdowns for budget talks. Sales needs the total planned cost plus margin for the offer price. All three views refresh from the same matrix.
The Toolchain as Methodology – and Its Fragility
The framework is inseparable from its implementation: a macro-enabled Excel application (Projektkostenplaner) and supplementary rate calculators, each identified by article number. The chapters read as product documentation. This is not inherently invalid – many project management methodologies are tool-backed – but it conflates the logic with the runtime.
The dependency creates three systemic fragilities. First, technological: VBA macros face blocking from Group Policy, Trust Center settings, and cloud environments (SharePoint, OneDrive, Teams co-authoring). No web-based, API-first, or Python/R alternative exists. If the macro breaks, the methodology stalls. Second, methodological: the deterministic risk model, rigid four-period rate horizon, and absence of currency conversion, tax treatment, or multi-entity consolidation limit applicability in long-duration, multi-currency, or cloud-native environments. Third, commercial: adoption outside the DACH region requires re-mapping German terminology (Verrechnungssatz, Kostenrechnung, Soll/Ist, PSP, Datenschnitte) and cost accounting standards (GPK/RLIC).
Agile Adaptation: A Corridor, Not a Commitment
For Scrum teams, the framework prescribes a cost corridor: “Sprint 1-3: €80k-€100k; Sprint 4-6: €70k-€95k.” The tool can model this by creating sprint phases with range quantities, but the text explicitly defers lightweight tracking – story-point burn-rate to cost conversion – to a separate handbook chapter. Practitioners must bridge this gap manually. The framework acknowledges that granular pre-planning is impossible in agile contexts, yet its tooling remains optimized for bottom-up, resource-driven logic.
What Remains When the Tool Is Stripped Away
The most immediate value for a non-tool-bound reader is the structural checklist. Does your cost plan link every euro to a PSP element, a partner, a resource, a period, and a certainty level? If not, you cannot price fixed-price work, accrue correctly, or negotiate change orders from data. The framework’s coherence – connecting the commercial act of pricing to the operational act of resourcing through a single auditable model – is its enduring contribution. A modern implementation would decouple that logic from the VBA runtime, exposing the calculation core via Python/Pandas or a low-code platform while retaining the pivot/Slicer UX for analysts. Until then, adopters must treat the tool as a prototype accelerator: valid for pilot phases, but requiring a migration path for enterprise rollout.